Date In Date Out Status Reviewer Contractor Comments
New04/13/20214/15/2021 11:53:00 AMDKLS1. Show height from average finished grade on elevation drawings 2. Include the geologic hazard disclosure statement (shown below) on the site plan. Fill out the disclosure statement referencing the geo hazard report done for this development by Entech April 12, 2016. Fill out the geo haz risks outlined in the original report and the mitigations kerri.schott@coloradosprings.gov
New07/11/20197/11/2019 5:21:00 PMDKSH1. Geohazard disclosure statement is required on the site plan. State the site specific geohazards along with the proposed mitigation. 2. Site specific soils and foundation reports are required for ALL lots. Reports must include mitigation recommendations for expansive soils. LOTS 4 &5 must discuss mitigation of any potential impacts on the stability of the retaining walls and address Entech's recommendations. 3. Global stability of the retaining walls must be evaluated by PE. Must include estimated impacts to the retaining walls from roads, driveways, and structures. Follow Entech's recommendations on surface and subsurface drainage, fill placement, must be part of construction plans. Please contact Katelyn with questions at katelyn.hyllested@coloradosprings.gov
New01/07/20191/8/2019 3:47:00 PMDKSH1. Recorded plat was included, geohazard report has been approved but a geohazard disclosure statement is required on the site plan. State the site specific geohazards along with the proposed mitigation. 2. An unapproved copy of the grading and erosion control plan was included in the plan set - the approved GECP must be included in resubmittal. 3. Site specific soils and foundation reports are required for ALL lots. Reports must include mitigation recommendations for expansive soils. LOTS 4 &5 must discuss mitigation of any potential impacts on the stability of the retaining walls and address Entech's recommendations. 4. Global stability of the retaining walls must be evaluated by PE. Must include estimated impacts to the retaining walls from roads, driveways, and structures. Follow Entech's recommendations on surface and subsurface drainage, fill placement, must be part of construction plans.
New03/14/20179/16/2016 3:49:00 PMDMGMSubmit copy of approved recorded final plat.
New03/14/20173/17/2017 10:28:00 AMDMGMsubmit copy of final recorded plat