City of Colorado Springs

Fire Prevention - Plan Review Status

Plan review comments update every hour. Please allow sufficient time for new comments to load prior to contacting a plan reviewer.
 


We are in the process of transitioning to a new plan review and inspection database. As a result, the plan review and plan log status reports will change and may not be available for a period of time. Please be patient with us during this transition as we work hard to improve our processes and communication to our customers.

NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

OUTLOOK BRIARGATE APARTMENTS
01650 BRIARGATE BLVD

Review DateStatusComment(s)
5/17/2021 Disapproved*****(DISAPPROVED) WATER SUPPLIES To help us ensure there is adequate exterior fire protection, please provide the following: --XXX--- Approved Water Plan (mains, hydrants, etc. for new structures in green field development)
Disapproved(DISAPPROVED) TEMPORARY ADDRESS A temporary address has been assigned to these plans. CSFD will not approve the construction plans until the Regional Building Department Enumerations Office has assigned a permanent address to this facility, and has approved the construction plans.
FYI(STANDARD COMMENT) CORRECTIONS All corrections and comments are to be submitted back to RBD. Corrections are not accepted over the phone, via fax, email or verbally.
FYI(STANDARD COMMENT) DEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 dee.withee@coloradosprings.gov
FYI(STANDARD COMMENT) REVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
3/23/2021 FYI*****(STANDARD COMMENT) This project is: Outlook Briargate, 1650 Briargate Bl: new apartment building - 3 units This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
Disapproved*****(DISAPPROVED) WATER SUPPLIES To help us ensure there is adequate exterior fire protection, please provide the following: --XXX--- Approved Water Plan (mains, hydrants, etc. for new structures in green field development)
Disapproved(DISAPPROVED) TEMPORARY ADDRESS A temporary address has been assigned to these plans. CSFD will not approve the construction plans until the Regional Building Department Enumerations Office has assigned a permanent address to this facility, and has approved the construction plans.
FYI(STANDARD COMMENT) CORRECTIONS All corrections and comments are to be submitted back to RBD. Corrections are not accepted over the phone, via fax, email or verbally.
FYI(STANDARD COMMENT) DEW REVIEWER CONTACT: If you have any specific questions or concerns about these comments, please feel free to contact me at: Doreen "Dee" Withee, PE Fire Protection Engineer II, CSFD 2880 International Circle, Suite 200-7 Colorado Springs, CO 80910 (T) 719-385-7361 dee.withee@coloradosprings.gov
FYI(STANDARD COMMENT) REVIEWS: 2015 IFC 105.4.4 Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
 



printer friendly versionPrinter friendly version